A platform for research: civil engineering, architecture and urbanism
Railroad bridge across Rhine
Description of construction by Army Engineers at Wesel in 10 1/4 days; piles driven to carry steel trestle towers supporting 75-ft steel I-beams.
Railroad bridge across Rhine
Description of construction by Army Engineers at Wesel in 10 1/4 days; piles driven to carry steel trestle towers supporting 75-ft steel I-beams.
Railroad bridge across Rhine
Construction Methods
1945
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New railroad bridge over the Rhine at Wesel
Engineering Index Backfile | 1928
|All-welded railroad bridge over Rhine-Main expressway
Engineering Index Backfile | 1962
|Engineering Index Backfile | 1945
|Bridge across the Rhine at Bonn
Engineering Index Backfile | 1895
|Construction of new railroad bridge over the Rhine at Ragaz
Engineering Index Backfile | 1928
|