A platform for research: civil engineering, architecture and urbanism
Bridge spans salvaged moved 78 miles upstream to new site and re-erected by TVA
Illustrations with brief text on how steel trusses were removed from piers, loaded on barges and towed to new site for re-erection over Kentucky reservoir.
Bridge spans salvaged moved 78 miles upstream to new site and re-erected by TVA
Illustrations with brief text on how steel trusses were removed from piers, loaded on barges and towed to new site for re-erection over Kentucky reservoir.
Bridge spans salvaged moved 78 miles upstream to new site and re-erected by TVA
Construction Methods
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four miles of bridge spans erected without falsework
Engineering Index Backfile | 1951
Complete bridge moved 22 miles
Engineering Index Backfile | 1932
|Bridge spans moved to bank for raising
Engineering Index Backfile | 1945
|Rock island lift bridge erected on old fixed spans
Engineering Index Backfile | 1932
Hortonsphere erected on timber bed and moved 800 feet
Engineering Index Backfile | 1944