A platform for research: civil engineering, architecture and urbanism
I-beam spans were rolled ashore and out of way while higher supports were prepared for bridge over Little Tarkio River in Missouri; skew truss main span was raised by jacks set under and floor beam with principal reactions taken by temporary beam attached to truss pin shoes; before alteration, crossing consisted of three 40-ft I-beam spans on one approach and single 120-ft truss span over channel.
I-beam spans were rolled ashore and out of way while higher supports were prepared for bridge over Little Tarkio River in Missouri; skew truss main span was raised by jacks set under and floor beam with principal reactions taken by temporary beam attached to truss pin shoes; before alteration, crossing consisted of three 40-ft I-beam spans on one approach and single 120-ft truss span over channel.
Bridge spans moved to bank for raising
Eng News-Rec
Enslow, V.W. (author)
Engineering News-Record ; 134
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Raising sunken bridge spans with chain hoists
Engineering Index Backfile | 1947
Bridge spans salvaged moved 78 miles upstream to new site and re-erected by TVA
Engineering Index Backfile | 1945
Spans moved 118 ft to new line in 30 min
Engineering Index Backfile | 1950
Handling complete bridge spans
Engineering Index Backfile | 1909
Merchants Bridge spans history
British Library Online Contents | 1995
|