A platform for research: civil engineering, architecture and urbanism
Lower Moriston Hydro-Electric scheme in Scotland
Generating station is constructed at bottom of 300 ft penstock and unusual methods are employed to remove rock spoil from tunnels which are 104 ft long by 46 ft wide by 78 ft high; roof is arched and was concreted and then grouted with cement under pressure; rubber tired transport and conveyor belts remove rock spoil; no rail track vehicles used.
Lower Moriston Hydro-Electric scheme in Scotland
Generating station is constructed at bottom of 300 ft penstock and unusual methods are employed to remove rock spoil from tunnels which are 104 ft long by 46 ft wide by 78 ft high; roof is arched and was concreted and then grouted with cement under pressure; rubber tired transport and conveyor belts remove rock spoil; no rail track vehicles used.
Lower Moriston Hydro-Electric scheme in Scotland
Surveyor
1956
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Lochaber hydro-electric scheme, Scotland
Engineering Index Backfile | 1927
Special features of affric hydro-electric scheme (Scotland)
Engineering Index Backfile | 1953
|Glen Affric scheme of north of Scotland hydro-electric board
Engineering Index Backfile | 1952
Loch sloy scheme of north of Scotland hydro-electric board
Engineering Index Backfile | 1950
Hydro-electric works in Scotland
Engineering Index Backfile | 1948