A platform for research: civil engineering, architecture and urbanism
Proposed relocation of North Entrance Channel, Buffalo Harbor, Buffalo, New York
Relocation of north entrance channel to harbor would necessitate removal of 800 ft section of existing Old Breakwater; 1:25 scale fixed-bed harbor model was used to determine proper position and minimum length of detached breakwater that will limit wave action in harbor; tests indicated use of detached 1800 ft long breakwater, located on north side of new channel for protection.
Proposed relocation of North Entrance Channel, Buffalo Harbor, Buffalo, New York
Relocation of north entrance channel to harbor would necessitate removal of 800 ft section of existing Old Breakwater; 1:25 scale fixed-bed harbor model was used to determine proper position and minimum length of detached breakwater that will limit wave action in harbor; tests indicated use of detached 1800 ft long breakwater, located on north side of new channel for protection.
Proposed relocation of North Entrance Channel, Buffalo Harbor, Buffalo, New York
US Army Corps Engrs -- Tech Report
1960
19 pages
13 plates, 7 Supp p
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Buffalo Harbor, New York (Maintenance)
NTIS | 1972
Buffalo Harbor, New York. (Maintenance)
NTIS | 1971