A platform for research: civil engineering, architecture and urbanism
Excessive water and running ground presents hazard in san jacinto tunnel construction
Difficulties in construction of tunnel 13 mi long carrying 1500 cfs; on three occasions Potrero shaft, 800 ft deep, was flooded within short distance of its top; typical timbering layout used in heavy ground.
Excessive water and running ground presents hazard in san jacinto tunnel construction
Difficulties in construction of tunnel 13 mi long carrying 1500 cfs; on three occasions Potrero shaft, 800 ft deep, was flooded within short distance of its top; typical timbering layout used in heavy ground.
Excessive water and running ground presents hazard in san jacinto tunnel construction
Western Construction News
Jarrett, S.M. (author)
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of San Jacinto memorial
Engineering Index Backfile | 1938
|Construction of San Jacinto memorial
Engineering Index Backfile | 1938
|Fight continues against water flows in tunnel driving at San Jacinto
Engineering Index Backfile | 1937
San jacinto tunnel -- Lining methods and problems of procedure
Engineering Index Backfile | 1939
|Progress in San Jacinto Tunnel speeded by inclined adit
Engineering Index Backfile | 1936