A platform for research: civil engineering, architecture and urbanism
Fight continues against water flows in tunnel driving at San Jacinto
Progress report on construction of 8.43 mi central section of San Jacinto Tunnel with special reference to method of combatting flow from water veins; construction of pumping station at bottom of shaft having total capacity of 10,000 gpm for 275-ft head; driving in heading; pioneer tunnels; gunite rings used as temporary lining support.
Fight continues against water flows in tunnel driving at San Jacinto
Progress report on construction of 8.43 mi central section of San Jacinto Tunnel with special reference to method of combatting flow from water veins; construction of pumping station at bottom of shaft having total capacity of 10,000 gpm for 275-ft head; driving in heading; pioneer tunnels; gunite rings used as temporary lining support.
Fight continues against water flows in tunnel driving at San Jacinto
Western Construction News
1937
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Grube continues the fight against separation
IuD Bahn | 2012
|San jacinto tunnel -- Lining methods and problems of procedure
Engineering Index Backfile | 1939
|Progress in San Jacinto Tunnel speeded by inclined adit
Engineering Index Backfile | 1936
Excessive water and running ground presents hazard in san jacinto tunnel construction
Engineering Index Backfile | 1935
|San Jacinto Water Supply for Houston
Wiley | 1954
|