A platform for research: civil engineering, architecture and urbanism
Method of construction of port at approximate expense of 1,000,000 British pounds, including main breakwater 1/4 mi long and lee breakwater about 1/2 mi long; use of precastconcrete blocks; dredging and reclamation of land; cost data. (See also Instn Civ Engrs -- Min Proc v 239 n 4964 1934 36 p 1 supp plate)
Method of construction of port at approximate expense of 1,000,000 British pounds, including main breakwater 1/4 mi long and lee breakwater about 1/2 mi long; use of precastconcrete blocks; dredging and reclamation of land; cost data. (See also Instn Civ Engrs -- Min Proc v 239 n 4964 1934 36 p 1 supp plate)
Construction of Haifa harbour
Engineering
Buckton, E.J. (author)
Engineering ; 139
1935
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Construction of Haifa harbour and oil dock
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1932
New harbour works at Haifa, Palestine
Engineering Index Backfile | 1933
New harbour works at Haifa, Palestine
Engineering Index Backfile | 1933