A platform for research: civil engineering, architecture and urbanism
Method of construction of port at approximate expense of 1,000,000 British pounds, including main breakwater 1/4 mi long and lee breakwater about 1/2 mi long; use of precastconcrete blocks; dredging and reclamation of land; cost data. (See also Engineering v 139 n 3607 Mar 1 1935 p 221-3)
Method of construction of port at approximate expense of 1,000,000 British pounds, including main breakwater 1/4 mi long and lee breakwater about 1/2 mi long; use of precastconcrete blocks; dredging and reclamation of land; cost data. (See also Engineering v 139 n 3607 Mar 1 1935 p 221-3)
Construction of Haifa harbour
Instn Civ Engrs -- Min Proc
Buckton, E.J. (author)
1934
36 pages
1 Supp plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|Construction of Haifa harbour and oil dock
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1932
New harbour works at Haifa, Palestine
Engineering Index Backfile | 1933
New harbour works at Haifa, Palestine
Engineering Index Backfile | 1933