A platform for research: civil engineering, architecture and urbanism
New harbour works at Dunkirk
Program includes: new outer harbor and deep-water entrance; embarkation mole in tidal harbor for passenger traffic; new entrance lock; floating dock of 20,000 tons lifting capacity; construction of new canal to provide for inland waterway drainage; illustrated description. (See also - n 4131 Mar 15 1935 p 279-81)
New harbour works at Dunkirk
Program includes: new outer harbor and deep-water entrance; embarkation mole in tidal harbor for passenger traffic; new entrance lock; floating dock of 20,000 tons lifting capacity; construction of new canal to provide for inland waterway drainage; illustrated description. (See also - n 4131 Mar 15 1935 p 279-81)
New harbour works at Dunkirk
Engineer
Engineer ; 159
1935
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dunkirk harbour extension works
Engineering Index Backfile | 1938
|Dunkirk harbour extension works
Engineering Index Backfile | 1938
|Improvements at dunkirk harbour
Engineering Index Backfile | 1937
|Works on new basin of port of Dunkirk
Engineering Index Backfile | 1961
|Engineering Index Backfile | 1963
|