A platform for research: civil engineering, architecture and urbanism
Extensive rock grouting at Boulder dam
Grouting in diversion and penstock tunnels as well as under dam, at pressures up to 1000 lb per sq in., including complete grout curtain at abutements of dam; drill bits and pipe connection for grouting contact area between rock foundation and concrete of dam; relation of low-pressure grout and vent holes in tunnel lining.
Extensive rock grouting at Boulder dam
Grouting in diversion and penstock tunnels as well as under dam, at pressures up to 1000 lb per sq in., including complete grout curtain at abutements of dam; drill bits and pipe connection for grouting contact area between rock foundation and concrete of dam; relation of low-pressure grout and vent holes in tunnel lining.
Extensive rock grouting at Boulder dam
Eng News-Rec
Engineering News-Record ; 114
1935
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Grouting foundations of Boulder Dam
Engineering Index Backfile | 1936
|Designs for grouting at Boulder dam
Engineering Index Backfile | 1936
|Grouting contraction joints at Boulder dam
Engineering Index Backfile | 1937
|Movement of Boulder dam due to grouting
Engineering Index Backfile | 1937
|