A platform for research: civil engineering, architecture and urbanism
Grouting foundations of Boulder Dam
Field procedure used and results obtained in grouting; conclusions as to best materials, equipment, and procedure for grouting; grouting supplemental cut-off holes; special equipment; recommended preparatory work; composition of grout.
Grouting foundations of Boulder Dam
Field procedure used and results obtained in grouting; conclusions as to best materials, equipment, and procedure for grouting; grouting supplemental cut-off holes; special equipment; recommended preparatory work; composition of grout.
Grouting foundations of Boulder Dam
Civ Eng (NY)
Jones, P.A. (author) / Minear, V.L. (author)
1936
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Designs for grouting at Boulder dam
Engineering Index Backfile | 1936
|Extensive rock grouting at Boulder dam
Engineering Index Backfile | 1935
Grouting contraction joints at Boulder dam
Engineering Index Backfile | 1937
|Movement of Boulder dam due to grouting
Engineering Index Backfile | 1937
|