A platform for research: civil engineering, architecture and urbanism
Deep sheetpile cutoff wall for fort peck dam
Driving of sheet-pile cut-off to max depths of 150 ft into shale requiring traveling towers nearly 200 ft high to handle longest piles, jet pipes and hammers; piles are spliced in air by welding; grout injected in holes 40 ft deep to seal shale and bentonite seams; servicing plant.
Deep sheetpile cutoff wall for fort peck dam
Driving of sheet-pile cut-off to max depths of 150 ft into shale requiring traveling towers nearly 200 ft high to handle longest piles, jet pipes and hammers; piles are spliced in air by welding; grout injected in holes 40 ft deep to seal shale and bentonite seams; servicing plant.
Deep sheetpile cutoff wall for fort peck dam
Eng News-Rec
Engineering News-Record ; 114
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed bracing holds sheetpile wall
Engineering Index Backfile | 1949
ASCE | 2021
|Engineering Index Backfile | 1942
|Engineering Index Backfile | 1934
|