A platform for research: civil engineering, architecture and urbanism
Demountable cableways place concrete at Norris dam
Method of handling of 1,000,000 yd of concrete required in construction of Norris dam, Tennessee, with duplicate 1925-ft span cableways each having rated capacity of hoisting 18 tons on hook at 300-ft, lowering this load at 400 ft and conveying it at 1200 ft per min.
Demountable cableways place concrete at Norris dam
Method of handling of 1,000,000 yd of concrete required in construction of Norris dam, Tennessee, with duplicate 1925-ft span cableways each having rated capacity of hoisting 18 tons on hook at 300-ft, lowering this load at 400 ft and conveying it at 1200 ft per min.
Demountable cableways place concrete at Norris dam
Construction Methods
Construction Methods ; 16
1934
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Norris Dam Construction Cableways
ASCE | 2021
|Twin cableways of long span place concrete at norris dam
Engineering Index Backfile | 1934
Norris dam construction cableways
Engineering Index Backfile | 1939
|Cableways place hoover dam concrete
Engineering Index Backfile | 1933
|