A platform for research: civil engineering, architecture and urbanism
Preliminary report on construction of steel-truss highway bridge, about 685 m total length, max span 212.16 m, over Rhine River between Neuwied and Weissenthurm.
Preliminary report on construction of steel-truss highway bridge, about 685 m total length, max span 212.16 m, over Rhine River between Neuwied and Weissenthurm.
Vorbericht ueber den bau der Strassenbruecke ueber den Rhein zwischen Neuwied und Weissenthurm
Vorbericht ueber den bau der Strassenbruecke ueber den Rhein zwischen Neuwied und Weissenthurm
Tils (author)
Bauingenieur ; 15
1934
4 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Strassenbruecke ueber den Rhein bei Neuwied, TILS
Engineering Index Backfile | 1935
Die Strassenbruecke ueber den Rhein bei Maxau
Engineering Index Backfile | 1968
|Bau einer Strassenbruecke ueber den Rhein in Krefeld-Uerdingen
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1937
|Die Strassenbruecke ueber den Lek bei Vianen
Engineering Index Backfile | 1935
|