A platform for research: civil engineering, architecture and urbanism
Largest all-welded bridge completed in New Jersey
Description of largest truss bridge ever built in United States by welding, just completed across Rancocas River, connecting Riverside and Delanco, NJ; built at cost of $270,890 bridge is 387 ft long with roadway 36 ft wide between curbs and one sidewalk 5 ft in width from center line of bridge truss to center line of hand rail; width of bridge, measured from center to center of trusses is 38 ft 6 in.
Largest all-welded bridge completed in New Jersey
Description of largest truss bridge ever built in United States by welding, just completed across Rancocas River, connecting Riverside and Delanco, NJ; built at cost of $270,890 bridge is 387 ft long with roadway 36 ft wide between curbs and one sidewalk 5 ft in width from center line of bridge truss to center line of hand rail; width of bridge, measured from center to center of trusses is 38 ft 6 in.
Largest all-welded bridge completed in New Jersey
Am Welding Soc -- J
Davis, A.F. (author)
1935
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
World's largest precast prestressed concrete bridge completed
Engineering Index Backfile | 1959
World's largest precast prestressed concrete bridge completed
Engineering Index Backfile | 1959
World's largest precast prestressed concrete bridge completed
Engineering Index Backfile | 1959
Canada's largest all-welded bridge
Engineering Index Backfile | 1937
|Largest moving job successfully completed
Engineering Index Backfile | 1929