A platform for research: civil engineering, architecture and urbanism
Description of one of first bridges to be erected entirely by welding, completed across St. Anne River at La Perade, Quebec, on King's Highway No. 2 main traffic artery between Montreal and Quebec; it is 642 ft long with 24-ft roadway and 5-ft sidewalk on each side; consists of six continuous deck girder spans, each 107 ft long.
Description of one of first bridges to be erected entirely by welding, completed across St. Anne River at La Perade, Quebec, on King's Highway No. 2 main traffic artery between Montreal and Quebec; it is 642 ft long with 24-ft roadway and 5-ft sidewalk on each side; consists of six continuous deck girder spans, each 107 ft long.
Canada's largest all-welded bridge
Welding Engr
Davis, A.F. (author)
Welding Engineer ; 22
1937
2 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canada's largest pacific airport
Engineering Index Backfile | 1943
|Largest all-welded bridge built in czechoslovakia
Engineering Index Backfile | 1932
|Largest all-welded bridge completed in New Jersey
Engineering Index Backfile | 1935
|Canada's largest lift span will be in Vancouver
Engineering Index Backfile | 1967
|Canada's first floating bridge
Engineering Index Backfile | 1958