A platform for research: civil engineering, architecture and urbanism
Principal factors to be considered in design and construction of temporary military bridges; load classification; adaptability of girder bridges; fighting crossing; kapok assault bridge; folding-boat equipment; pontoon equipment; small box girder and method of launching it; semi-permanent bridges; comparison of bridge lengths and road space; welding.
Principal factors to be considered in design and construction of temporary military bridges; load classification; adaptability of girder bridges; fighting crossing; kapok assault bridge; folding-boat equipment; pontoon equipment; small box girder and method of launching it; semi-permanent bridges; comparison of bridge lengths and road space; welding.
Military bridging
Inst Civ Engrs -- Special Lecture
Sayer, A.P. (author)
1934
23 pages
3 Supp sheets
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1941
|Military and emergency bridging systems
Engineering Index Backfile | 1944
The move towards fully automated military bridging systems
British Library Conference Proceedings | 2000
|