A platform for research: civil engineering, architecture and urbanism
Methods of unloading, blending and transporting of cement by 6000-ft pipe line for construction of Boulder Dam; details of Fluxo pump unit; cement batcher; screening.
Methods of unloading, blending and transporting of cement by 6000-ft pipe line for construction of Boulder Dam; details of Fluxo pump unit; cement batcher; screening.
Bulk cement handling at Boulder dam
Western Construction News
Yates, J.P. (author)
1934
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Boulder dam cement and concrete studies
Engineering Index Backfile | 1934
|Portland cement. Boulder canyon project, Arizona-California-Nevada
Engineering Index Backfile | 1934
Handling 2,000,000 cu yd. of excavation at Boulder Dam
Engineering Index Backfile | 1933
Engineering Index Backfile | 1941
Extended Application of Cement-Based Grouting to Gravel/Boulder Ground Improvement
Springer Verlag | 2019
|