Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods of unloading, blending and transporting of cement by 6000-ft pipe line for construction of Boulder Dam; details of Fluxo pump unit; cement batcher; screening.
Methods of unloading, blending and transporting of cement by 6000-ft pipe line for construction of Boulder Dam; details of Fluxo pump unit; cement batcher; screening.
Bulk cement handling at Boulder dam
Western Construction News
Yates, J.P. (Autor:in)
1934
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Boulder dam cement and concrete studies
Engineering Index Backfile | 1934
|Portland cement. Boulder canyon project, Arizona-California-Nevada
Engineering Index Backfile | 1934
Handling 2,000,000 cu yd. of excavation at Boulder Dam
Engineering Index Backfile | 1933
Extended Application of Cement-Based Grouting to Gravel/Boulder Ground Improvement
Springer Verlag | 2019
|Engineering Index Backfile | 1941