A platform for research: civil engineering, architecture and urbanism
Conduit and canal work progresses at fast pace on Colorado river aqueduct
Construction progress report; dragline excavation without hand finishing; special finishers used for subgrade and concrete; slip forms used for canal lining; gantry hopper used in placing conduit concrete.
Conduit and canal work progresses at fast pace on Colorado river aqueduct
Construction progress report; dragline excavation without hand finishing; special finishers used for subgrade and concrete; slip forms used for canal lining; gantry hopper used in placing conduit concrete.
Conduit and canal work progresses at fast pace on Colorado river aqueduct
Western Construction News
1935
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Machines and methods for canal construction, Colorado river aqueduct
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1941
Machines and methods for canal construction, Colorado river aqueduct
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1931
|Colorado river aqueduct expansion
Engineering Index Backfile | 1957
|