A platform for research: civil engineering, architecture and urbanism
Arapuni (New Zealand) hydro-electric power development
Features of 200,000-hp. project on Waikato River, for supplying power to district and city of Auckland, 160 mi. south, including curved concrete dam 192 ft. high, concrete-lined tunnel 726 ft. long, 14, 000 sec. ft. capacity, etc.; cost when fully developed estimated at 15 pounds per kw. (see also abstracts in Mech. World, vol. 85, no. 2212, May 24, 1929, pp. 481-483; and Engineer, vol. 147, no. 3828, May 24, 1929, p. 581)
Arapuni (New Zealand) hydro-electric power development
Features of 200,000-hp. project on Waikato River, for supplying power to district and city of Auckland, 160 mi. south, including curved concrete dam 192 ft. high, concrete-lined tunnel 726 ft. long, 14, 000 sec. ft. capacity, etc.; cost when fully developed estimated at 15 pounds per kw. (see also abstracts in Mech. World, vol. 85, no. 2212, May 24, 1929, pp. 481-483; and Engineer, vol. 147, no. 3828, May 24, 1929, p. 581)
Arapuni (New Zealand) hydro-electric power development
Instn Civil Engrs -- Proc
Handman, F.W.A. (author)
1929
30 pages
2 Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1935
|Hydro-electric power development at Arapuni, New Zealand
Engineering Index Backfile | 1928
|The Arapuni (New Zealand) Hydro-Electric Power Development
Engineering Index Backfile | 1930
|Hydro-electric power supply in North Island of New Zealand
Engineering Index Backfile | 1932
|