A platform for research: civil engineering, architecture and urbanism
Hydro-electric power development at Arapuni, New Zealand
Aug 1928 n 8 p 515-526: Object of hydroelectric power development to provide power for city and province of Auckland; main dam is combination of arched and gravity section and is 210 ft. in height from bottom of foundations to crest; plant employed; mass concrete in main dam; aggregate; monocable ropeway from quarry to site of dam 8.83 mi.; erection; signaling system; crushing plant. Oct 1928 n 10 p 660-668, 13 figs.: River-diversion tunnel; length of tunnel is 720.5 lin. ft.; excavation; tools employed; outlet-section and inlet section excavation; timbering of enlarged section; untimbered and timbered section.
Hydro-electric power development at Arapuni, New Zealand
Aug 1928 n 8 p 515-526: Object of hydroelectric power development to provide power for city and province of Auckland; main dam is combination of arched and gravity section and is 210 ft. in height from bottom of foundations to crest; plant employed; mass concrete in main dam; aggregate; monocable ropeway from quarry to site of dam 8.83 mi.; erection; signaling system; crushing plant. Oct 1928 n 10 p 660-668, 13 figs.: River-diversion tunnel; length of tunnel is 720.5 lin. ft.; excavation; tools employed; outlet-section and inlet section excavation; timbering of enlarged section; untimbered and timbered section.
Hydro-electric power development at Arapuni, New Zealand
Concrete Constr. Eng
Martin, F.D. (author)
1928
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Arapuni (New Zealand) hydro-electric power development
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1935
|The Arapuni (New Zealand) Hydro-Electric Power Development
Engineering Index Backfile | 1930
|Hydro-electric power supply in North Island of New Zealand
Engineering Index Backfile | 1932
|