A platform for research: civil engineering, architecture and urbanism
Low-cost concrete warehouse
Precasting and prestressing of beams, girders, columns and walls saved $45,000 compared with cast-in-place construction on materials handling warehouse, built for Boeing Airplane Co, Seattle, Wash; building required 146 girders, 44 ft long and 44 in. deep; 460 beams, 39 ft long, 34 in. deep; 190 columns, 24 in. sq and 26 ft high, and 500 3.5×20-ft wall panels; construction of cast-in-place roof, serving as parking area for 1000 cars, was simplified by use of portable tower.
Low-cost concrete warehouse
Precasting and prestressing of beams, girders, columns and walls saved $45,000 compared with cast-in-place construction on materials handling warehouse, built for Boeing Airplane Co, Seattle, Wash; building required 146 girders, 44 ft long and 44 in. deep; 460 beams, 39 ft long, 34 in. deep; 190 columns, 24 in. sq and 26 ft high, and 500 3.5×20-ft wall panels; construction of cast-in-place roof, serving as parking area for 1000 cars, was simplified by use of portable tower.
Low-cost concrete warehouse
Eng News-Rec
Engineering News-Record ; 155
1955
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete warehouse construction
Engineering Index Backfile | 1954
Precast concrete warehouse construction
Engineering Index Backfile | 1947
|Precast concrete warehouse floor
Engineering Index Backfile | 1942
European Patent Office | 2021
|52 concrete umbrellas roof warehouse
Engineering Index Backfile | 1962
|