A platform for research: civil engineering, architecture and urbanism
Der Geisingtunnel der neuen Vollspurbahn Heidenau-Altenberg
Design and construction of single track railroad tunnel, 236 m long, near Geising, Germany; drainage and waterproofing of tunnel; cost amounted to 2280 marks per lin m.
Der Geisingtunnel der neuen Vollspurbahn Heidenau-Altenberg
Design and construction of single track railroad tunnel, 236 m long, near Geising, Germany; drainage and waterproofing of tunnel; cost amounted to 2280 marks per lin m.
Der Geisingtunnel der neuen Vollspurbahn Heidenau-Altenberg
Der Geisingtunnel der neuen Vollspurbahn Heidenau-Altenberg
Hildebrand (author)
Bautechnik ; 15
1937
7 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Hochwasserschadensbeseitigung Strecke Heidenau - Altenberg
IuD Bahn | 2005
|Der Geisingtunnel der neuen Vollspurbahn Heidenau-Altenberg
Engineering Index Backfile | 1937
|Wiederaufbau der Strecke Heidenau - Altenberg
IuD Bahn | 2003
|British Library Online Contents | 2010
|