A platform for research: civil engineering, architecture and urbanism
Willamette River program approved by U. S. engineers
Plan for $80,000,000 development of water resources on important Oregon stream, including construction of Detroit concrete arch dam on North Santiam River 259 ft high; reservoir program; cost of flood control storage; irrigation projects, areas and storage costs; construction of additional power facilities; stream purification; fish protection.
Willamette River program approved by U. S. engineers
Plan for $80,000,000 development of water resources on important Oregon stream, including construction of Detroit concrete arch dam on North Santiam River 259 ft high; reservoir program; cost of flood control storage; irrigation projects, areas and storage costs; construction of additional power facilities; stream purification; fish protection.
Willamette River program approved by U. S. engineers
Western Construction News
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Willamette valley flood control program launched by Portland district U.S. engineers
Engineering Index Backfile | 1946
Erection of willamette river bridge
Engineering Index Backfile | 1912
Project Feasibility Analysis: Willamette River Study
British Library Conference Proceedings | 2014
|Willamette River Poses HDD Challenges
British Library Conference Proceedings | 2007
|The Willamette—a river in peril
Wiley | 1997
|