A platform for research: civil engineering, architecture and urbanism
Description of monumental cutoff walls, grout curtains and under-drainage provisions of rock fill dams described in article indexed in Engineering Index 1937 p 302, from Eng News-Rec Dec 2 1937; vertical joints permitting movement in cutoff walls; new KLM process of chemical grouting, with water glass and salt solutions, premixed and pretreated, injected simultaneously and setting after predetermined interval. (See also - discussion v 121 n 6 Aug 11 1938 p 164)
Description of monumental cutoff walls, grout curtains and under-drainage provisions of rock fill dams described in article indexed in Engineering Index 1937 p 302, from Eng News-Rec Dec 2 1937; vertical joints permitting movement in cutoff walls; new KLM process of chemical grouting, with water glass and salt solutions, premixed and pretreated, injected simultaneously and setting after predetermined interval. (See also - discussion v 121 n 6 Aug 11 1938 p 164)
Algerian rockfill dam substructures
Eng News-Rec
Gutmann, I. (author)
Engineering News-Record ; 120
1938
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Algerian rockfill dam substructures
Engineering Index Backfile | 1938
|Algerian rockfill dam substructures
Engineering Index Backfile | 1938
|Algerian dams of placed rockfill
Engineering Index Backfile | 1937
|TIBKAT | 1971
|Engineering Index Backfile | 1958