A platform for research: civil engineering, architecture and urbanism
Review of new laid fill practice developed in recent construction for Algerian dams, varying in height from 76 ft to 410 ft; placing of laid rubble; design and construction of impervious two-course concrete deck and jointless asphalt deck; design of spillways. (See also - editorial comment p 886)
Review of new laid fill practice developed in recent construction for Algerian dams, varying in height from 76 ft to 410 ft; placing of laid rubble; design and construction of impervious two-course concrete deck and jointless asphalt deck; design of spillways. (See also - editorial comment p 886)
Algerian dams of placed rockfill
Eng News-Rec
Gutmann, I. (author)
Engineering News-Record ; 119
1937
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Blast-placed membraneless rockfill dams for hydropower schemes
Springer Verlag | 1976
|Blast-placed membraneless rockfill dams for hydropower schemes
Online Contents | 1976
|Algerian rockfill dam substructures
Engineering Index Backfile | 1938
|Algerian rockfill dam substructures
Engineering Index Backfile | 1938
|Algerian rockfill dam substructures
Engineering Index Backfile | 1938
|