A platform for research: civil engineering, architecture and urbanism
Description of Boston water supply dam 2640 ft long, 170 ft high; hydraulic fill placed by gravity flow from high level hog box fed by series of belt conveyors from three borrowpits; excavating and conveying; mixing and sluicing.
Description of Boston water supply dam 2640 ft long, 170 ft high; hydraulic fill placed by gravity flow from high level hog box fed by series of belt conveyors from three borrowpits; excavating and conveying; mixing and sluicing.
Novel earth handling at Quabbin dam
Eng News-Rec
Gow, F.W. (author)
Engineering News-Record ; 120
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Novel earth handling at Quabbin dam
Engineering Index Backfile | 1938
|Hydraulic fill at Quabbin Dike
Engineering Index Backfile | 1936
Discussion on Quabbin Dams and Aqueduct
ASCE | 2021
|Emergency Action Planning for Quabbin Reservoir
British Library Conference Proceedings | 1992
|Massachusetts' Quabbin Reservoir-A Model for Watershed Management
British Library Conference Proceedings | 1995
|