A platform for research: civil engineering, architecture and urbanism
Hydraulic fill at Quabbin Dike
Description of contractors plant for placement of 2,000,000 cu yd of embankment for Boston water supply dam 135 ft high, 800 ft wide at base, and 2140 ft long at crest.
Hydraulic fill at Quabbin Dike
Description of contractors plant for placement of 2,000,000 cu yd of embankment for Boston water supply dam 135 ft high, 800 ft wide at base, and 2140 ft long at crest.
Hydraulic fill at Quabbin Dike
Eng News-Rec
Engineering News-Record ; 116
1936
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Quabbin Dike Built by Hydraulic Fill Method
ASCE | 2021
|Discussion on Quabbin Dams and Aqueduct
ASCE | 2021
|Novel earth handling at Quabbin dam
Engineering Index Backfile | 1938
|Novel earth handling at Quabbin dam
Engineering Index Backfile | 1938
|Emergency Action Planning for Quabbin Reservoir
British Library Conference Proceedings | 1992
|