A platform for research: civil engineering, architecture and urbanism
Changed condition under contracts
Discussion of procedure for equitable adjustment of contracts in case of changed conditions, previously unknown, and disclosed by borings and other operations, with special reference to tunnel construction, dredged materials, driving piles, changing methods of construction, change in materials, difference in quantities, etc.
Changed condition under contracts
Discussion of procedure for equitable adjustment of contracts in case of changed conditions, previously unknown, and disclosed by borings and other operations, with special reference to tunnel construction, dredged materials, driving piles, changing methods of construction, change in materials, difference in quantities, etc.
Changed condition under contracts
Eng News-Rec
King, G.A. (author) / Sheilds, G.R. (author)
Engineering News-Record ; 121
1938
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Changed condition under contracts
Engineering Index Backfile | 1938
|Changed conditions clause in construction contracts
Engineering Index Backfile | 1964
|Changed Conditions Clause in Construction Contracts
ASCE | 2021
|Sharing of risks under changed ground conditions in design/build contracts
British Library Conference Proceedings | 1997
|