A platform for research: civil engineering, architecture and urbanism
Methods of sinking caissons and construction of continuous girder units for new causeway over Galveston Bay; over 2 mi of viaduct and earth causeway constructed by dredging parallel canal for light, fast moving barge plant, from which construction operations were carried out. From paper before Texas Section, Am Soc Civil Engrs.
Methods of sinking caissons and construction of continuous girder units for new causeway over Galveston Bay; over 2 mi of viaduct and earth causeway constructed by dredging parallel canal for light, fast moving barge plant, from which construction operations were carried out. From paper before Texas Section, Am Soc Civil Engrs.
Viaduct built from barges
Eng NewsRec
Grace, J.E. (author)
Engineering News-Record ; 121
1938
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Seagoing barges built of concrete
Engineering Index Backfile | 1944
Concrete barges built true to design dimensions
Engineering Index Backfile | 1918
Susquehanna concrete viaduct built in halves
Engineering Index Backfile | 1916
Steel Viaduct built during the winter
Engineering Index Backfile | 1928