A platform for research: civil engineering, architecture and urbanism
Steel Viaduct built during the winter
Steel structure of Sparkill Viaduct project on Route 9-W recently completed opens for summer traffic; total length of project is 2200 ft. of which 1261 ft. is occupied by steel structure, remainder being used for approaches; approaches paved with reinforced-concrete to width of 30 ft.; contract price for work is $270,634, of which New York State pays $129,304 and Palisades Interstate Park Commission $141,330.
Steel Viaduct built during the winter
Steel structure of Sparkill Viaduct project on Route 9-W recently completed opens for summer traffic; total length of project is 2200 ft. of which 1261 ft. is occupied by steel structure, remainder being used for approaches; approaches paved with reinforced-concrete to width of 30 ft.; contract price for work is $270,634, of which New York State pays $129,304 and Palisades Interstate Park Commission $141,330.
Steel Viaduct built during the winter
Contractors Engrs. Monthly
1928
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Viaduct is built of reinforced concrete and encased steel
Engineering Index Backfile | 1925
Susquehanna concrete viaduct built in halves
Engineering Index Backfile | 1916
Street-car viaduct built over railway terminal
Engineering Index Backfile | 1933
|