A platform for research: civil engineering, architecture and urbanism
Construction canals serve builders of Neches River Bridge
Bridge at Port Arthur, Tex, total length 1 1/2 mi, carrying roadway on 5% grade from filled highway approaches on both sides of river to max elevation of 184 ft at center of channel; canals dredged specially for floating of equipment for construction of piers and abutments.
Construction canals serve builders of Neches River Bridge
Bridge at Port Arthur, Tex, total length 1 1/2 mi, carrying roadway on 5% grade from filled highway approaches on both sides of river to max elevation of 184 ft at center of channel; canals dredged specially for floating of equipment for construction of piers and abutments.
Construction canals serve builders of Neches River Bridge
Construction Methods Equipment
1938
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction canals serve builders of Neches River Bridge
Engineering Index Backfile | 1938
How equipment builders serve construction industry
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1950
|Skilled bridge builders conquer "old man river"
Engineering Index Backfile | 1956
|Skilled bridge builders conquer "old man river"
Engineering Index Backfile | 1956
|