A platform for research: civil engineering, architecture and urbanism
Contractor's equipment and methods used on aqueduct conduit
Description of work on Colorado River Aqueduct project; construction of 35,229 ft of conduit, extending east from San Jacinto Tunnel to connect with Whitewater tunnels; invert jumbo and concrete placing equipment; aggregate and concrete preparation; design of arch forms; jumbo units used to move inside and outside panels in sections of 11 ft 8 in.
Contractor's equipment and methods used on aqueduct conduit
Description of work on Colorado River Aqueduct project; construction of 35,229 ft of conduit, extending east from San Jacinto Tunnel to connect with Whitewater tunnels; invert jumbo and concrete placing equipment; aggregate and concrete preparation; design of arch forms; jumbo units used to move inside and outside panels in sections of 11 ft 8 in.
Contractor's equipment and methods used on aqueduct conduit
Western Construction News
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Contractor's equipment and methods used on aqueduct conduit
Engineering Index Backfile | 1938
Hoisting equipment used for Delaware Aqueduct. Shafts
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1949
|Wiley | 2020
|Conduit and canal work progresses at fast pace on Colorado river aqueduct
Engineering Index Backfile | 1935