A platform for research: civil engineering, architecture and urbanism
Proposed down-town terminal of the Hudson River tunnel system
Illustrations showing the exterior appearance of the buildings, and indicating the inside arrangement. The two office buildings which will be built on the terminal site on Church St. from Cortlandt to Fulton St. will be 22-stories high above the surface. (900 w.) (No. 81043)
Proposed down-town terminal of the Hudson River tunnel system
Illustrations showing the exterior appearance of the buildings, and indicating the inside arrangement. The two office buildings which will be built on the terminal site on Church St. from Cortlandt to Fulton St. will be 22-stories high above the surface. (900 w.) (No. 81043)
Proposed down-town terminal of the Hudson River tunnel system
Ry Age
1906
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1882
|Engineering Index Backfile | 1889
ASCE | 2021
|ASCE | 2021
|Engineering Index Backfile | 1920
|