A platform for research: civil engineering, architecture and urbanism
Erosion along 900 yd of beach with loss of about 4-ft depth necessitated construction of groynes and breastwork parallel to wall about 57 ft from it; breastwork consists of 18-ft lengths of steel rails driven into beach, anchored back and supporting louvre-like assembly of 2×6-in. boards placed flat and spaced 1 1/2 in. apart. (See also - discussion p 577-9)
Erosion along 900 yd of beach with loss of about 4-ft depth necessitated construction of groynes and breastwork parallel to wall about 57 ft from it; breastwork consists of 18-ft lengths of steel rails driven into beach, anchored back and supporting louvre-like assembly of 2×6-in. boards placed flat and spaced 1 1/2 in. apart. (See also - discussion p 577-9)
Protection of Preston beach, Weymouth Bay
Instn Mun Engrs -- J
Nachshen, M. (author)
1949
3 pages
Diagrams
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|