A platform for research: civil engineering, architecture and urbanism
Shoreham harbour development scheme
Scheme involves improved entrance formed by two new breakwaters west and east of harbor entrance, and demolition and removal of existing east pier; new lock to be constructed adjoining Prince George lock.
Shoreham harbour development scheme
Scheme involves improved entrance formed by two new breakwaters west and east of harbor entrance, and demolition and removal of existing east pier; new lock to be constructed adjoining Prince George lock.
Shoreham harbour development scheme
Engineer
Engineer ; 187
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Cement works at Shoreham-By-Sea
Engineering Index Backfile | 1951
Cement works at Shoreham-By-Sea
Engineering Index Backfile | 1951
SHOREHAM FLOOD DEFENCE - REACH W5 CASE STUDY
TIBKAT | 2021
|