Harbor alterations carried out to facilitate entry of colliers of 4500 tons dw to fuel power stations; lay-by berths, new lock and turning basin were constructed; 1,000,000 cu yd of dredging was carried out; principal work involved breakwater and locks; foundation failure caused by artesian water pressure necessitated redesign of lock walls; cost of improvements was £2,750,000.
Harbor alterations carried out to facilitate entry of colliers of 4500 tons dw to fuel power stations; lay-by berths, new lock and turning basin were constructed; 1,000,000 cu yd of dredging was carried out; principal work involved breakwater and locks; foundation failure caused by artesian water pressure necessitated redesign of lock walls; cost of improvements was £2,750,000.
Shoreham harbour development
Instn Civ Engrs -- Proc
Ridehalgh, H. (author)
1958
12 pages
2 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shoreham harbour development scheme
Engineering Index Backfile | 1949
Cement works at Shoreham-By-Sea
Engineering Index Backfile | 1951
Cement works at Shoreham-By-Sea
Engineering Index Backfile | 1951
SHOREHAM FLOOD DEFENCE - REACH W5 CASE STUDY
TIBKAT | 2021
|