A platform for research: civil engineering, architecture and urbanism
Office building in four months
Precast concrete frame made possible 4-mo erection schedule for office building near Pittsburgh, Pa; 60 × 140 ft in plan; 56 ft high; 16 × 16-in. columns 53 ft high, extending full height of building; design based on working stress of 2250 psi, with 20,000 psi for reinforcing steel.
Office building in four months
Precast concrete frame made possible 4-mo erection schedule for office building near Pittsburgh, Pa; 60 × 140 ft in plan; 56 ft high; 16 × 16-in. columns 53 ft high, extending full height of building; design based on working stress of 2250 psi, with 20,000 psi for reinforcing steel.
Office building in four months
Eng News-Rec
Engineering News-Record ; 142
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
River lock completed four months early
Engineering Index Backfile | 1965
|Four-side ventilation window suitable for high-rise office building
European Patent Office | 2022
|