Planning and construction of Belleville Locks on Ohio River are discussed; two locks measure 600 and 1200 ft in length respectively, 110 ft in width, 65 ft in height above bed rock; major problems included construction of foundation work before spring flood of 1964 and close scheduling of delivery of materials, most of which came by barge from as far as 300 mi; forming and concreting of lock are described.
Planning and construction of Belleville Locks on Ohio River are discussed; two locks measure 600 and 1200 ft in length respectively, 110 ft in width, 65 ft in height above bed rock; major problems included construction of foundation work before spring flood of 1964 and close scheduling of delivery of materials, most of which came by barge from as far as 300 mi; forming and concreting of lock are described.
River lock completed four months early
Civ Eng (NY)
Howard, R.B. (author)
1965
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bronx river parkway drive completed
Engineering Index Backfile | 1933
|$5,500,000 Cooper river bridge completed
Engineering Index Backfile | 1929
Baker river power project completed
Engineering Index Backfile | 1925
|East Delaware Tunnel Construction to Be Completed Six Months Ahead of Time
British Library Online Contents | 2002
|East Delaware tunnel construction to be completed six months ahead of time
Engineering Index Backfile | 1954
|