A platform for research: civil engineering, architecture and urbanism
Deft material handling in limited area expedited erection of skyscraper
Report on erection of 33-story Esso Building in New York City; steel structure erected by derrick that rose with frame, and relay derrick on 10th floor setback; how lack of space for storage and handling of materials were overcome; wall erection standardized.
Deft material handling in limited area expedited erection of skyscraper
Report on erection of 33-story Esso Building in New York City; steel structure erected by derrick that rose with frame, and relay derrick on 10th floor setback; how lack of space for storage and handling of materials were overcome; wall erection standardized.
Deft material handling in limited area expedited erection of skyscraper
Eng News-Rec
McLean, R. (author)
Engineering News-Record ; 141
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Skyscraper steel erection in RCA building
Engineering Index Backfile | 1932
Tower erection methods expedited hoover dam line
Engineering Index Backfile | 1931
|Elsevier | 1985
|TIBKAT | 1990
|