A platform for research: civil engineering, architecture and urbanism
Tower erection methods expedited hoover dam line
Base sections of H-type structures and stubs, or footings, of A-type towers were assembled in material yards at distribution points and dipped in hot bath of asphalt; this resulted in cheaper labor cost than possible with field assembly, since work was done under more convenient conditions and with maximum efficiency.
Tower erection methods expedited hoover dam line
Base sections of H-type structures and stubs, or footings, of A-type towers were assembled in material yards at distribution points and dipped in hot bath of asphalt; this resulted in cheaper labor cost than possible with field assembly, since work was done under more convenient conditions and with maximum efficiency.
Tower erection methods expedited hoover dam line
Elec. World
Halpenny, R.H. (author)
Electrical World ; 98
1931
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
TOWER ERECTION SYSTEM AND TOWER ERECTION INSTALLATION METHOD
European Patent Office | 2022
|Deft material handling in limited area expedited erection of skyscraper
Engineering Index Backfile | 1948
|Foundations for transmission line towers and tower erection
Engineering Index Backfile | 1915
|