A platform for research: civil engineering, architecture and urbanism
Tummel-garry hydro-electric works
Works include three generating stations with 75,000, 57, 000 and 15,000-kw capacity and gross operating heads being 606, 173 and 48 ft, respectively; Clunie dam of concrete gravity type 70 ft high; data on construction of dam, tunnel and surge chamber; concrete gravity Pitlochry dam and generating station. (See also - n 1 Jan 1949 p 9-17)
Tummel-garry hydro-electric works
Works include three generating stations with 75,000, 57, 000 and 15,000-kw capacity and gross operating heads being 606, 173 and 48 ft, respectively; Clunie dam of concrete gravity type 70 ft high; data on construction of dam, tunnel and surge chamber; concrete gravity Pitlochry dam and generating station. (See also - n 1 Jan 1949 p 9-17)
Tummel-garry hydro-electric works
Concrete Constr Eng
1949
4 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Garry and Moriston hydro-electric schemes
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1953
Garry and Moriston Developments
Engineering Index Backfile | 1959
Redefining play spaces - Garry Campbell
Online Contents | 2009
Fort garry town planning scheme
Engineering Index Backfile | 1929
|