A platform for research: civil engineering, architecture and urbanism
Garry and Moriston hydro-electric schemes
Design and construction of Quoich rockfill dam with upstream reinforced concrete membrane; use of Trief concrete in dams and tunnels, and of precast concrete facing blocks in place of shuttering; Taintor gates and tilting gate for flood control at Dundreggan dam; treatment of inverts in low pressure tunnels throughout Schemes; surge control arrangements; mechanical and electrical aspects.
Garry and Moriston hydro-electric schemes
Design and construction of Quoich rockfill dam with upstream reinforced concrete membrane; use of Trief concrete in dams and tunnels, and of precast concrete facing blocks in place of shuttering; Taintor gates and tilting gate for flood control at Dundreggan dam; treatment of inverts in low pressure tunnels throughout Schemes; surge control arrangements; mechanical and electrical aspects.
Garry and Moriston hydro-electric schemes
Instn Civ Engrs -- Proc
Roberts, C.M. (author) / Wilson, E.B. (author) / Thornton, J.H. (author) / Headland, H. (author)
1958
28 pages
Plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tummel-garry hydro-electric works
Engineering Index Backfile | 1949
Engineering Index Backfile | 1953
Garry and Moriston Developments
Engineering Index Backfile | 1959
Redefining play spaces - Garry Campbell
Online Contents | 2009
Fort garry town planning scheme
Engineering Index Backfile | 1929
|