A platform for research: civil engineering, architecture and urbanism
New York City code bases permissible load on load tests; test must be made on at least one pile for each 15,000 sq ft of building area and on minimum of two piles for any project; maximum working load is load that causes net settlement of not more than 0.01 in. per ton of total test load; application of rolled structural steel piles and concrete piles; minimum spacing.
New York City code bases permissible load on load tests; test must be made on at least one pile for each 15,000 sq ft of building area and on minimum of two piles for any project; maximum working load is load that causes net settlement of not more than 0.01 in. per ton of total test load; application of rolled structural steel piles and concrete piles; minimum spacing.
New pile code sets load-test criteria
Eng News-Rec
Thornley, J.H. (author)
Engineering News-Record ; 142
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Helical Pile Acceptance Criteria, Design Guidelines, and Load Test Verification
British Library Conference Proceedings | 2011
|Engineering Index Backfile | 1956
|Concrete filled steel pile for dynamic pile load test and pile load test method thereof
European Patent Office | 2020
Concrete filled steel pile for dynamic pile load test and pile load test method thereof
European Patent Office | 2020
|