A platform for research: civil engineering, architecture and urbanism
Colorado-bit T -- Granby dam and reservoir key units
Earthfill structure, final and key dam of project under construction, will impound Colorado River water in 546,000-acre-ft reservoir, whence it will be pumped into Grand Lake and flow through Adams Tunnel; embankment material procured near site, passed through grizzley before placing.
Colorado-bit T -- Granby dam and reservoir key units
Earthfill structure, final and key dam of project under construction, will impound Colorado River water in 546,000-acre-ft reservoir, whence it will be pumped into Grand Lake and flow through Adams Tunnel; embankment material procured near site, passed through grizzley before placing.
Colorado-bit T -- Granby dam and reservoir key units
Western Construction News
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Colorado-big T -- Construction of Granby pump plant
Engineering Index Backfile | 1947
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1941
Engineering Index Backfile | 1956
|Construction of Granby pumping plant
Engineering Index Backfile | 1953
|