A platform for research: civil engineering, architecture and urbanism
Colorado-big T -- Construction of Granby pump plant
Description of Granby pumping plant which will lift Colorado River Water to elevation required for delivery to portal of Adams Tunnel under construction simultaneously with Granby Dam; excavation in sandstone about 115 ft deep; data on intake pipe, pump canal and adjustable inside form for concrete pipe.
Colorado-big T -- Construction of Granby pump plant
Description of Granby pumping plant which will lift Colorado River Water to elevation required for delivery to portal of Adams Tunnel under construction simultaneously with Granby Dam; excavation in sandstone about 115 ft deep; data on intake pipe, pump canal and adjustable inside form for concrete pipe.
Colorado-big T -- Construction of Granby pump plant
Western Construction News
1947
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Granby pumping plant
Engineering Index Backfile | 1953
|The Granby Pumping Plant: A Symposium: Construction
ASCE | 2021
|Colorado-bit T -- Granby dam and reservoir key units
Engineering Index Backfile | 1948
Engineering Index Backfile | 1947
|Granby pumping plant foundations and design
Engineering Index Backfile | 1953
|