A platform for research: civil engineering, architecture and urbanism
Safety is main item on first membrane-lined earth reservoir
Baldwin Hills reservoir will have capacity of 900 acre ft; main dam, of compacted earthfill, rises 155 ft above canyon floor; lining of reservoir consists of waterproof membrane, 4 in. cemented gravel, topped with cemented roofing gravels, 10 ft of selected compacted fill and 3 in. asphaltic concrete.
Safety is main item on first membrane-lined earth reservoir
Baldwin Hills reservoir will have capacity of 900 acre ft; main dam, of compacted earthfill, rises 155 ft above canyon floor; lining of reservoir consists of waterproof membrane, 4 in. cemented gravel, topped with cemented roofing gravels, 10 ft of selected compacted fill and 3 in. asphaltic concrete.
Safety is main item on first membrane-lined earth reservoir
Western Construction News
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building small concrete-lined earth reservoir
Engineering Index Backfile | 1926
|Circular earth embankment lined with concrete forms oil reservoir
Engineering Index Backfile | 1918
|Circular Earth Embankment lined with concrete forms oil reservoir
Engineering Index Backfile | 1918
|100-mg. asphalt-lined reservoir
Engineering Index Backfile | 1952
|A small concrete lined reservoir
Engineering Index Backfile | 1917
|