A platform for research: civil engineering, architecture and urbanism
Chemical treatment cures sick tunnel
When 14 × 8 ft access tunnel for Alpha, (Ill) Coal Co, had been advanced 375 ft, work had to be halted because of water pouring in through waterbearing sand layer; remedy was driving of pipes and injection of gel forming silicate of soda and calcium chloride which solidified sand.
Chemical treatment cures sick tunnel
When 14 × 8 ft access tunnel for Alpha, (Ill) Coal Co, had been advanced 375 ft, work had to be halted because of water pouring in through waterbearing sand layer; remedy was driving of pipes and injection of gel forming silicate of soda and calcium chloride which solidified sand.
Chemical treatment cures sick tunnel
Construction Method Equipment
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1993
Online Contents | 1993
Cures "mud boils" in tunnel with pressure grouting
Engineering Index Backfile | 1947
Engineering Index Backfile | 1928
|Chemical sensitivity and sick-building syndrome
TIBKAT | 2017
|